Construction and demolition (C&D) waste recycling plant

The recycling plant in the region of Zemplén-Abaúj performs and recycles cca. 51,000 tons of construction and demolition waste (asphalt, concrete, rock) every year.

The whole processing procedure is monitored and controlled by a computerised system.

The main point of this technology is to produce secondary raw materials (products) which can be used characteristically in the building industry from the different types of waste after treating.